“Every quote I get is all over the map.”
One line-item estimate after a walkthrough. You see what each piece costs before you sign anything.

We price basements by the square foot: $65 to $120 per sq ft depending on finish level, and most take 8 to 12 weeks. Below is a rough number for your size, what a finished one looks like, and a 60-second way to get your own number.
A finished basement by Mile High Home Works. Room to gather, unwind and make the most of the home you already have.


Three finish levels, and each one builds on the last. Set your basement's size, then scroll and watch the tiers stack.
Framing, drywall and flooring. One open space, no rooms.
About $65,000 for 1,000 sq ftAdds bedrooms and mid-grade bathrooms.
About $85,000 for 1,000 sq ftHigher-end finishes throughout.
About $120,000 for 1,000 sq ftAVERAGE ESTIMATE ONLY. Rates are averages per finished square foot. Layout, plumbing runs, egress windows and the finishes you pick all change the number, so treat this as a rough guide, not a quote. For your actual number, call (720) 807-4099 or fill out the form.
A closer look at our basement work, from the room as a whole to the details that bring it together.






All 7 Google reviews are five stars. A few excerpts are shown here.
We hear these on almost every first call. Here is how we answer them.
“Every quote I get is all over the map.”
One line-item estimate after a walkthrough. You see what each piece costs before you sign anything.
“Nobody will tell me what the egress window actually costs.”
We price it on the walkthrough. Concrete cut, window well and drainage are on the estimate, not a change order.
“The last contractor disappeared for two weeks.”
You get a schedule on day one. And a text every afternoon the crew is on site.
“Is $85 a square foot realistic for my house?”
Tell us the size and what you want. We text back a ballpark the same day, before anyone comes out.
Filling out the form doesn't commit you to anything. Here is exactly what happens after you tap submit.
ZIP, project, size and budget. It lands on Luis's phone the moment you submit.
From a person, with a first ballpark and a few times to walk the space.
We measure, check the mechanicals and talk through what you want down there.
Line-item pricing, a schedule and what's included. No pressure and no expiring offers.
Cost, timeline, permits, living through it and paying for it. Straight answers.
We price by the square foot, in three tiers. Base, about $65 per sq ft: framing, drywall and flooring, no rooms. Mid, about $85: adds bedrooms and mid-grade bathrooms. High-end, about $120: higher-end finishes. A 1,000 sq ft basement at the mid tier is roughly $85,000. These are averages, not quotes. Call (720) 807-4099 or fill out the form for your actual number.
Most basements take 8 to 12 weeks from permit approval to final walkthrough. Permits in the Denver metro usually add two to four weeks before that, and we handle the whole process.
Yes, every time. A finished basement with a bedroom or bathroom needs permits and inspections, and skipping them causes problems when you sell. We pull them, schedule the inspections and build to code.
No. We seal the basement off from the rest of the house. Expect some noise during framing and dust control at the stairs. Most families live upstairs the whole time.
Yes. We work with financing partners for projects this size and walk you through the options on the first call. You're never required to use them.
A few quick questions, about 60 seconds. Luis texts you back personally, usually the same day.